Purpose:
<?>
Objective:
<?>
Description:
<?>
Inputs:
<?>
Outputs:
<?>
Controls:
<?>
Task Instructions:
Design the Product or Product Component
Establish a Technical Data Package
Design System Architecture
- Using the Architecture Design Document Template, [the Project Architect] with support from [The Business Analyst] is responsible for Developing the high-level architecture.
- Using the Decision Analysis and Resolutions Process, [the Project Architect] is responsible for planning plan out the formal evaluation steps in making the decisions to choose the best possible solution. using the system views that are developed as specified below.
Develop Logical Data Model
- [the Project Architect] is responsible for Creating a logical data model for the system based on the architectural design decisions made thus far in the project.
- Using the Customer and Product Requirements Document, [the Data Architect] with support from [?] is responsible for facilitating and capturing the data requirements from the Customer and Product Requirements to develop the Logical Data Model.
- Using the Project Configuration Management, [the Data Architect] is responsible for checking in the system’s Logical Data Model into the Project Configuration Management repository.
- Using the Logical Data Model and Global Data Standards Documents [the Data Architect] is responsible for Checking the logical data model into the corporate model.
Design Interfaces Using Criteria
Perform Make, Busy, or Reuse Analyses
Present to Architectural Review Committee
- Using the Architectural Design Document and the Logical Data Model, [the Project Architect] with support from the [Data Architect] is responsible for presenting the Architectural Design including the Logical Data Model to the Architectural Review Committee.
- Using the meeting minutes, [the Project architect] with support from the data architect is responsible for ensuring that the review feedback is captured in the meeting minutes.
- Using the Project Meeting Minutes, [the Project Manager] is responsible for ensuring that the issues identified are addressed effectively and resolved quickly.
Update Architecture Design Document
- Using the Architectural Design Document, [the Project Architect] is responsible for updating the Architectural Design Document based on the feedback received from the Architectural Review Committee.
- Using the Architectural Design Checklist, [the Project Architect] is responsible for completing all the sections of the Architectural Design Document and conducting a validation, and the Logical Data Model shall be attached to the Architectural Design Document in any inconsistency between the Design and Data Models shall be resolved.
Create IT Standards Bill of Material (BoM)
- Using the IT Standards Catalog and IT Standards Bill of Material (BoM), [the Project Manager], with support from IT Procurement, Business Analyst, and Project Architect is responsible for creating the IT Standards Bill of Material.
- Using the IT Standards Catalog, [the Project Manager], with support from IT Procurement, Business Analyst, and Project Architect is responsible for documenting hardware and software products to be used by the system.
- Using the IT Standards Change Request Form, [the Project Manager] is responsible for initiating a request for approval of the new components when existing IT Standards are not applicable as soon as they are identified to avoid schedule lags in obtaining approvals.
- Using the IT Standards Change Request Form, [the Project Manager] is responsible for requesting a deviation from IT Standards when potential non-standard products are identified.
- Using the Draft IT Standards Bill of Material, [the Project Manager] is responsible for updating the IT Standards Bill of Material after selecting to buy a component.
- Using the IT Standards Change Request Form, [the Project Manager] is responsible after obtaining approval from the Senior Manager to request a deviation from IT Standards.
- Using the Standards Change Request Number, [the Project Manager] is responsible for updating the project’s IT Standards Bill of Material with the Standards Change Request number.
Perform Make, Buy, or Reuse Analyses
Verify Reuse Options
- Using the <?>, [the ?] with support from <?> is responsible for