Purpose:

A preliminary Project Plan Peer Review is performed.

Objective:

Ensure that the Preliminary Project Plan meets the specified requirements.

Description:

Preliminary Project Plan Peer Review is a review in which the Reviewers perform a review of the Preliminary Project Plan and communicate the review feedback through e-mail or the identified review tool. [The Project Manager] incorporates the feedback and tracks the closure of the defects.

Inputs:

  • Current Preliminary Project Plan version

Outputs:

  • Preliminary Project Plan Peer Review results
  • Preliminary Project Plan Peer Review issues
  • Preliminary Project Plan Peer Review data.

Controls:

Task Instructions:

Prepare for Preliminary Project Plan Peer Review

    1. Using the Preliminary Project Plan document, [the Project Manager] is responsible for ensuring that the current version of the Preliminary Project Plan is ready for review by verifying its completeness against the project requirements, adherence to the stipulated standards, and quality in terms of spell check, grammar, etc.
    2. Using Outlook, [the Project Manager] is responsible for scheduling a meeting with [the EPQG Manager] to discuss conducting a Preliminary Project Plan Peer Review.
    3. Using the Preliminary Project Plan Peer Review Invitation Meeting Template and Current Version of the Preliminary Project Plan, [the Project Manager], with support from the [the EPQG Manager], is responsible for identifying the appropriate reviewers for reviewers.
    4. Using the Current Version of the Preliminary Project Plan, [the Project Manager] is responsible for preparing the document for review by adding line numbers and creating a new version.
      • MS Word > Layout > Page Setup > Line Numbers.
    5. Using the Preliminary Project Plan Peer Review Invitation Meeting, [the Project Manager], with support from [the EPQG Manager], is responsible for preparing the document.
    6. Using the Preliminary Project Plan Peer Review Invitation Meeting Document, the New Preliminary Project Plan Version, and supporting documents, [the EPQG Manager] is responsible for requesting a Preliminary Project Plan Peer Review.

Conduct Preliminary Project Plan Peer Review

    1. Using the Received Preliminary Project Plan Peer Review Logs, [the EPQG Manager] is responsible for following up with Reviewers who have not provided their input.
    2. Using the Preliminary Project Plan Peer Review Summary Report Template and the Received Preliminary Project Plan Peer Review Logs and [the EPQG Manager], with support from [the Project Manager], is responsible for merging the review logs.
    3. Using the Preliminary Project Plan Peer Review Summary Report Template, [the EPQG Manager], with support from [the Project Manager], is responsible for consolidating suggested modifications.
    4. Using the Master Preliminary Project Plan Peer Review Log, [the EPQG Manager], with support from [the Project Manager], is responsible for requesting additional clarity on reported modifications, if necessary, and getting clarification.

Analyze Preliminary Project Plan Peer Review Data

    1. Using the Preliminary Project Plan Peer Review Summary Report and following the Project Document Control Process, [the Project Manager] is responsible for incorporating Peer Review modifications and revising the Preliminary Project Plan.
    2. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for ensuring that the modifications do not introduce new and unintended deficiencies.
    3. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager], with support from [the EPQG], is responsible for verifying the closure of the peer review modification and ensuring that the Preliminary Project Plan is ready to be released.
    4. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for updating the Defect Fix Status after verification.
    5. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for ensuring that the Peer Review conducted meets the Preliminary Project Plan Peer Review defined exit criteria.
    6. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for completing the document and quality in terms of spell check, grammar, etc.
    7. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for archiving the document as per the Project Data Management Process.
    8. Using the Preliminary Project Plan Peer Review Summary Report, [the Project Manager] is responsible for communicating review results.